Edition 3 at DIS ballot, stage 40.20/ Planning date 12 September 2027, an estimate/ ISO/IEC/IEEE 29148:2018 applies today
ISO 29148 Revision CheckerThe requirements record, clause by clause, and the edition that follows it
ABOUT

Who builds this, and why

ISO 29148 Revision Checker is published by The Art of Service. It exists because the third edition of the requirements engineering standard is in the awkward period between a draft and a standard: late enough to plan for, too early to rebuild a requirement set around. The site holds the requirements that apply today, reads the public revision record honestly, and sells the work product that turns both into a plan.

The requirement record is read from the published ISO/IEC/IEEE 29148:2018, the same record the compliance library uses. The revision layer is the ISO standard page 94091. Where the record is silent, the page says so. The site does not reproduce the standard text and does not have the DIS requirement text.

Who it is for

The requirements lead or systems engineering manager on a project that follows 15288 or 12207, the software quality or regulatory lead who carries a sector process model beside it, and the consultant asked whether a requirement set conforms. It is written for someone who has to hand an answer to a project board or an assessor, not for someone who wants a summary to skim.

Byline

Gerard Blokdyk, founder of The Art of Service. Contact support@theartofservice.com. The Art of Service Pty Ltd, theartofservice.com.

The clause interpretations and the evidence lists are the publisher's reading, bylined here. We do not name a reviewer we have not engaged. If a named, credentialed reviewer is added, the name and credentials will appear here and on the methodology page.

This is an independent reference. It is not affiliated with, endorsed by or published by ISO, IEC or IEEE. ISO, IEC and IEEE are the owners of their respective marks and publications.

What the site does not do

It does not certify, audit, give legal advice or replace an assessor. It does not claim the draft is final or that a clause will change in a particular way. It does not sell the ISO text. It does not promise that a project will conform.

Editorial record

Last updated: . The record's change date is the same date. The sources were retrieved on 19 October 2026. Corrections go to support@theartofservice.com and are made in the record, not patched on a page.

THE RECORD

The rules this is built from

Every line names its source. The 60 records are written from the published ISO/IEC/IEEE 29148:2018, in our words, with the clause cited. The revision layer is read from the public ISO stage record and its scope abstract. Where the public record is silent, the page says so.

60 RECORDS

Clause by clause, and the information items

Each page states the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the edition changes.

Open the register
10 ANNEX A PAGES

The OpsCon content, labelled

Annex A content is part of a full conformance claim. Annex B is informative. Annex C is the tailoring process.

Open Annex A
ONE STAGE RECORD

No invented date

The DIS is at 40.20. The planning date is an estimate and is labelled wherever it appears.

Read the revision record

The ISO/IEC/IEEE 29148:2018 text is not reproduced. The DIS requirement text is not public and is not reproduced. The record this site reads is linked on the standards page.