How the record is built and checked
One record, every output
One reviewed record holds each requirement, the evidence, the gaps, the revision note, the dates and a source pointer on every field. The clause pages, the free check, the kit and the watch all replay that record. A correction is made once and regenerated, so a page cannot drift from the register.
The requirement text is ours
The ISO/IEC/IEEE 29148:2018 text is not reproduced. Each requirement line is a paraphrase written from our clause record, with the clause cited. Titles and defined terms remain as the standard names them. A strict seven-word overlap check runs against the published text before release.
What the revision layer can and cannot say
The DIS requirement text is not public. The revision layer therefore uses the ISO page for the stage, the date, the committee, the page count and the scope abstract. It does not state a draft requirement as if it were text, and it does not invent a clause level change. Where the public record is silent, the page says the record is silent.
The dates
Stage dates to 40.20 are from the ISO page. The 40.60 date is derived from the 12 week ballot. Publication is not recorded. The planning date of 12 September 2027 is an estimate made by this site and is not an ISO commitment. A project's own target is its own. Every date that is derived or estimated says so where it appears.
How the record is checked
- Every requirement has a clause citation and a source link.
- The free check returns incomplete, not a lighter verdict, when an answer is blank or impossible.
- A strict word-overlap check against the held 2018 print comes back clean.
- The refresh script re-reads the ISO page and fails on an unexplained change.
- Every page is read on desktop and phone, with the check run through its states.
- Two random unit pages share under 30 percent of their sentences.
What is not claimed
No claim that a page will be cited by a search engine or an AI assistant. No claim that the draft is final. No claim that a project will conform. No invented statistics, reviews or dates. No claim about how a standard text was obtained.
The rules this is built from
Every line names its source. The 60 records are written from the published ISO/IEC/IEEE 29148:2018, in our words, with the clause cited. The revision layer is read from the public ISO stage record and its scope abstract. Where the public record is silent, the page says so.
Clause by clause, and the information items
Each page states the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the edition changes.
Open the registerThe OpsCon content, labelled
Annex A content is part of a full conformance claim. Annex B is informative. Annex C is the tailoring process.
Open Annex ANo invented date
The DIS is at 40.20. The planning date is an estimate and is labelled wherever it appears.
Read the revision recordThe ISO/IEC/IEEE 29148:2018 text is not reproduced. The DIS requirement text is not public and is not reproduced. The record this site reads is linked on the standards page.