Edition 3 at DIS ballot, stage 40.20/ Planning date 12 September 2027, an estimate/ ISO/IEC/IEEE 29148:2018 applies today
ISO 29148 Revision CheckerThe requirements record, clause by clause, and the edition that follows it
SPECIMEN

A labelled sample of the kit

Six rows from the register, rendered from the live record, plus the evidence list and the plan page they feed. The paid kit carries all 60 records, the full evidence list, the common gaps and the dated plan, as PDF, CSV and XLSX. This page is a sample: it is not your data and it is not the whole kit.

ClauseRecordFirst evidence itemOwnerStatus
4.2Full conformanceA dated statement naming the framework, the edition and the four areas of the full claim, signed by the project authorityOwner to assignOpen
5.2.5Characteristics of individual requirementsOne row per requirement with the nine characteristics and the reviewer's judgementOwner to assignOpen
5.2.6Characteristics of a set of requirementsA review of the whole set for duplication, conflict, units and terminologyOwner to assignOpen
6.4.3.5Manage system or software requirementsThe explicit agreement on the system or software requirements, with the versionOwner to assignOpen
6.5.2Requirements activities in verificationEach requirement, the method, the criterion, the owner, the event and the resultOwner to assignOpen
9.6SRS contentThe baselined specification, organized to the clause 9.6 content listOwner to assignOpen

The sample shows the shape, not the full wording. The owner column is blank in the kit because the owner is yours to assign. The full kit adds the other records, the gap list, the evidence list and the dated plan to the planning date and your own target.

SAMPLE PDF

Six pages, labelled

The cover, six register rows, the evidence list and the plan, with the specimen watermark.

Open the sample PDF

SAMPLE CSV

Six rows

The same six rows in a sortable file.

Open the sample CSV

FULL KIT

USD 149 one off

60 records, 240 evidence items, the dated plan and the crosswalk. The watch is the alert service, separate from the kit.

Buy the kit

What the kit is not. It is not a certification, an audit or legal advice. It does not reproduce the standard. The requirements are our words and the planning date is an estimate.
THE RECORD

The rules this is built from

Every line names its source. The 60 records are written from the published ISO/IEC/IEEE 29148:2018, in our words, with the clause cited. The revision layer is read from the public ISO stage record and its scope abstract. Where the public record is silent, the page says so.

60 RECORDS

Clause by clause, and the information items

Each page states the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the edition changes.

Open the register
10 ANNEX A PAGES

The OpsCon content, labelled

Annex A content is part of a full conformance claim. Annex B is informative. Annex C is the tailoring process.

Open Annex A
ONE STAGE RECORD

No invented date

The DIS is at 40.20. The planning date is an estimate and is labelled wherever it appears.

Read the revision record

The ISO/IEC/IEEE 29148:2018 text is not reproduced. The DIS requirement text is not public and is not reproduced. The record this site reads is linked on the standards page.