A labelled sample of the kit
Six rows from the register, rendered from the live record, plus the evidence list and the plan page they feed. The paid kit carries all 60 records, the full evidence list, the common gaps and the dated plan, as PDF, CSV and XLSX. This page is a sample: it is not your data and it is not the whole kit.
| Clause | Record | First evidence item | Owner | Status |
|---|---|---|---|---|
| 4.2 | Full conformance | A dated statement naming the framework, the edition and the four areas of the full claim, signed by the project authority | Owner to assign | Open |
| 5.2.5 | Characteristics of individual requirements | One row per requirement with the nine characteristics and the reviewer's judgement | Owner to assign | Open |
| 5.2.6 | Characteristics of a set of requirements | A review of the whole set for duplication, conflict, units and terminology | Owner to assign | Open |
| 6.4.3.5 | Manage system or software requirements | The explicit agreement on the system or software requirements, with the version | Owner to assign | Open |
| 6.5.2 | Requirements activities in verification | Each requirement, the method, the criterion, the owner, the event and the result | Owner to assign | Open |
| 9.6 | SRS content | The baselined specification, organized to the clause 9.6 content list | Owner to assign | Open |
The sample shows the shape, not the full wording. The owner column is blank in the kit because the owner is yours to assign. The full kit adds the other records, the gap list, the evidence list and the dated plan to the planning date and your own target.
Six pages, labelled
The cover, six register rows, the evidence list and the plan, with the specimen watermark.
USD 149 one off
60 records, 240 evidence items, the dated plan and the crosswalk. The watch is the alert service, separate from the kit.
The rules this is built from
Every line names its source. The 60 records are written from the published ISO/IEC/IEEE 29148:2018, in our words, with the clause cited. The revision layer is read from the public ISO stage record and its scope abstract. Where the public record is silent, the page says so.
Clause by clause, and the information items
Each page states the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the edition changes.
Open the registerThe OpsCon content, labelled
Annex A content is part of a full conformance claim. Annex B is informative. Annex C is the tailoring process.
Open Annex ANo invented date
The DIS is at 40.20. The planning date is an estimate and is labelled wherever it appears.
Read the revision recordThe ISO/IEC/IEEE 29148:2018 text is not reproduced. The DIS requirement text is not public and is not reproduced. The record this site reads is linked on the standards page.