Edition 3 at DIS ballot, stage 40.20/ Planning date 12 September 2027, an estimate/ ISO/IEC/IEEE 29148:2018 applies today
ISO 29148 Revision CheckerThe requirements record, clause by clause, and the edition that follows it

For the requirements lead on a 15288 or 12207 project

The requirements standard is changing. Know what applies now.

ISO/IEC/IEEE 29148:2018 is the edition your project is assessed against today. The third edition is at DIS ballot. This site states the current obligation clause by clause, separates what the public record proves about the revision from what it does not, and gives you a dated plan.

Read from the real rules, not invented. Every answer this site gives points to the official rule behind it, so you can check any line yourself.

Read from the real rules55 official rules behind itCheck any line yourself

USD 149 obligation kit, one offUSD 19 a month change watchFree record and check

Run the free readiness check See the kit specimen

No account for the free check. Not legal advice; does not certify.

Engineers reviewing a system model and a printed requirements set at a work tableEdition 3 at DIS ballot
40.20 / now14 Sep 2026DIS ballot initiated, 12 weeks
40.607 Dec 2026Close of voting, derived
50.00Not recordedFDIS registered
60.60Not recordedInternational Standard published
Plan12 Sep 2027Planning estimate, not an ISO date
FREE CHECK

Is the requirement set ready for the edition change?

Six questions. The check returns the process set that applies, the information items you are missing, a readiness reading and three actions. It runs in the browser and sends nothing.

This decides which process clauses and information items apply.
Baselined, not draft.
The site uses 12 September 2027 as an estimate. Put your own date here; the plan is yours.

The check runs in your browser and sends nothing anywhere. It returns a reading of your answers, not a compliance result, and it names the evidence each action needs.

What the check can decide

Readiness, not conformity

It applies the published process set, the information item list and the dates you enter. It does not audit the requirements, does not decide whether a contract claim is met, and does not replace an assessor.

What it reads: ISO/IEC/IEEE 29148:2018 clauses 4 to 9 and Annex A, the ISO page for the DIS at stage 40.20, and the planning estimate of 12 September 2027. The readiness reading counts the answers; it is not a compliance score.

Open the full check and its method

THE RECORD

The requirements that apply today

These are the clauses of ISO/IEC/IEEE 29148:2018, plus the information item content in clause 9 and Annex A. Each has its own page with the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the revision.

ClauseRecordGroupStatus
4.2Full conformanceConformanceCurrent edition
4.5Tailored conformanceConformanceCurrent edition
5.2.1The requirements engineering functionConceptsCurrent edition
5.2.2StakeholdersConceptsCurrent edition
5.2.3From needs to requirementsConceptsCurrent edition
5.2.4The requirements constructConceptsCurrent edition
5.2.5Characteristics of one requirementConceptsCurrent edition
5.2.6Characteristics of a setConceptsCurrent edition
5.2.7Requirement language criteriaConceptsCurrent edition
5.2.8Requirements attributesConceptsCurrent edition
5.3.2Iteration and recursionConceptsCurrent edition
6.1The required process setProcessesCurrent edition

All 45 records Annex A content

REVISION

What the public record shows, and what it does not

CONFIRMED

Edition 3, stage 40.20

ISO records a DIS of 101 pages, prepared by ISO/IEC JTC 1/SC 7, with the ballot initiated on 14 September 2026 for 12 weeks. It will replace the 2018 edition.

Read the stage record
CONFIRMED

The scope is unchanged

The public abstract repeats the same four purposes: the processes, the guidelines for 15288 and 12207, the information items, and their content and format.

What the record shows
NOT PUBLIC

The clause text and change list

ISO sells the draft. There is no public clause level change list. This site does not invent one, and says so on every page that touches the revision.

Read the limit
A requirements review at a table with a system model, notes and a laptop
What this is for: the person who has to answer a project board or an assessor about the requirement set. Every record names the evidence to hold and the gap to close, so the answer can be checked line by line instead of taken on trust.
PRICE

Free to read. Pay for the work product.

FREE
USD 0
no account
  • All 55 records
  • The Annex A content pages
  • The revision record and the stage dates
  • The readiness check
  • The plan builder and the specimen
Start reading
OBLIGATION KIT
USD 149
one off / PDF, CSV, XLSX
  • 55-record obligation register
  • 220 evidence items, by clause
  • 165 common gaps, by clause
  • A dated plan to the planning date and your own target
  • The clause and information item crosswalk
  • Single organization licence
Buy the kit, USD 149
CHANGE WATCH
USD 19
a month / cancel any time
  • The kit files while active
  • Email when the record or a date changes
  • The diff and the source that changed
  • No alert when nothing changed
  • Cancel from the account page
Start the watch

Prices in US dollars through Stripe. The kit is one off. The watch is monthly and includes the kit files while it is active. A kit buyer gets the regenerated files when the third edition is published, at no extra charge. Nothing is metered and there is no per-seat charge. What each includes.

THE RECORD

The rules this is built from

Every line names its source. The 55 records are written from the published ISO/IEC/IEEE 29148:2018, in our words, with the clause cited. The revision layer is read from the public ISO stage record and its scope abstract. Where the public record is silent, the page says so.

55 RECORDS

Clause by clause, and the information items

Each page states the requirement in our words, the evidence an assessor asks for, the common gaps and what to do before the edition changes.

Open the register
10 ANNEX A PAGES

The OpsCon content, labelled

Annex A content is part of a full conformance claim. Annex B is informative. Annex C is the tailoring process.

Open Annex A
ONE STAGE RECORD

No invented date

The DIS is at 40.20. The planning date is an estimate and is labelled wherever it appears.

Read the revision record

The ISO/IEC/IEEE 29148:2018 text is not reproduced. The DIS requirement text is not public and is not reproduced. The record this site reads is linked on the standards page.

QUESTIONS

What buyers ask

What is ISO/IEC/IEEE 29148?

It is the international standard for requirements engineering. It specifies the requirements processes used with ISO/IEC/IEEE 15288 and 12207, the information items those processes produce, and the required content of those items. The second edition is the published edition that applies today. A third edition is at DIS ballot. Read the revision record.

Does the DIS change what my project must do today?

No. A draft cannot be cited as the applicable standard and cannot be certified against. The published second edition applies until the third edition is published. The draft is a planning signal, not a current obligation. The stage record says what is confirmed and what is not.

When will the third edition be published?

ISO has not recorded a publication date. The draft is at stage 40.20, with the ballot initiated on 14 September 2026 for 12 weeks. This site uses 12 September 2027 as a planning estimate and labels it an estimate everywhere. The next public checkpoints are 40.60, 40.99, 50.00 and 60.60.

What does the change mean for an SRS or a SyRS?

The public abstract keeps the same scope: the processes, the information items and their content. The DIS requirement text is not public, so this site does not claim a clause level change. The practical work is to make the current set meet the 2018 content requirements and to keep the clause references under review. The register shows the current obligations.

Is ISO 29148 certifiable?

No. It is a process and information item standard, not a management system standard with a certification scheme. A project can claim conformance, in a contract or an internal procedure, and an assessor can examine the evidence. That is different from a certificate. The site does not certify anyone.

What do I get for USD 149?

The obligation kit: the full 55-record register, the 220-item evidence list and a dated plan, as PDF, CSV and XLSX. The labelled specimen shows the shape. The pricing page states what is free. The change watch is USD 19 a month and emails you when the record, its guidance or its dates change.

PROVENANCE

Where the record comes from

The requirement record is read from the published ISO/IEC/IEEE 29148:2018, checked on 19 October 2026. The revision record is the ISO standard page 94091, retrieved on 19 October 2026. It is not written from memory or from a search snippet. Where the public record does not show a change, the page says so rather than inventing one. Read the sources and the method.