6.5.2
ISO/IEC/IEEE 29148:2018
Processes

Clause 6.5.2: Requirements activities in verification

Current editionISO/IEC/IEEE 29148:2018, Clause 6.5.2Edition 3 at DIS ballotNo public change recorded

The requirements work in verification selects the verification method or technique and the criteria for every verification action.

What clause 6.5.2 asks

The requirements work in verification selects the verification method or technique and the criteria for every verification action. The method is best associated with the requirement when the requirement is written. It defines how, who, when and where compliance will be shown. The four standard methods are test, demonstration, analysis (including simulation) and inspection. Certification can be an alternative. The method and its result are recorded in a requirements traceability matrix or a verification cross reference matrix, and traceability of the verified elements is maintained.

Why it matters

The clause turns verifiability from an adjective into a record. A requirement with no method is not yet verifiable, even if it looks measurable. The four methods have different evidence strengths, and the choice should follow the property being verified, not the convenience of the test team.

In the public record

No clause level change is public for this unit; the DIS keeps the title and scope, and the requirement text is not released.

What good looks like

Add a verification method and a success criterion to every requirement at authoring time. Record who will witness the evidence and when, as an event rather than a calendar date. Keep the matrix under configuration control with the requirement set.

Evidence an assessor asks for

The assessor will pick a requirement marked verified and ask for the objective evidence. A method with no result is a plan, not verification.

  • Verification matrix Each requirement, the method, the criterion, the owner, the event and the result
  • Method rationale Why inspection, analysis, demonstration or test was chosen for this property
  • Witness record Who will witness the evidence and what counts as a pass
  • Traceability The link from the verified element back to the requirement

Where it commonly fails

  • Every requirement is assigned test, including properties that cannot be tested economically
  • The verification method is chosen by the test team after the design freeze
  • A certificate is treated as verification without a link to the requirement

What to do before the revision

Choose the method when the requirement is written. It changes how the requirement is worded, and it exposes requirements that cannot be verified at all.

Read across

← 6.5.1 Requirements activities in architecture definition 6.5.3 Requirements activities in validation →